TRI
DineCore Services

Valspar / Clayton
ROCKFORD, ILLINOIS
Soil Vapor Extraction (above)

 

Air Sparging / Dual Phase /
Soil Vapor Extraction


Inland Steel / Van Leer Containers / Remediation Technologies, Alsip, IL - Installation of an air sparging system and IHV treatment of hazardous solvent contaminated soils and ground water, removal and replacement of sewer lines.

Bell Fuels / Bascor, Mount Prospect, IL - TRI mobilized its Dual Phase Extraction system to the Bell Fuels site located in Chicago. An interceptor trench, 2 feet wide by 60 feet long by 8 feet deep was excavated to accommodate the 4" slotted PVC. The interceptor trench along with a previously installed vertical extraction well was connected to the DPE system. The purpose of the DPE system was to remove free-product gasoline.

Valspar / Clayton, Rockford, IL - Trenching & installation of 800 feet of HDPE to a series of 10 SVE wells. Fusing of HDPE, connection to well heads & gauge installation.

TRI Services

  • Environmental Remediation Services
  • Earthwork & Construction Services
  •  


    © Copyright 2003, Thermal Remediation Inc.
    All rights reserved